1) Carrying out laboratory studies of mineral preparation

  • Definition of representative and technological sample
  • Carrying out and monitoring sampling
  • Providing mineral preparation instructions to the laboratory
  • Monitoring tests
  • Processing lab results
  • Summarizing and presenting the initial flowsheet
  • Preparing a complete report on mineral preparation studies on a laboratory scale.

2) Conducting pilot mineral preparation studies

  • Determining the characteristics of the representative sample
  • Monitoring the pilot sample sampling
  • Monitoring the pilot test
  • Preparation of final flowsheet with mass and energy balance
  • Estimation of equipment and facilities required by the factory
  • Preparing a complete report on mineral preparation studies on a pilot scale

3)Designing and implementation of pretreatment and leaching lines

  • Execution of copper leaching and flotation projects
  • Executing optimization projects of leaching and flotation production lines of copper
  • Executing capacity increasing plans and developing leaching and flotation lines
  • Designing all types of thickeners

4)Design and implementation of granulation lines and Complex Concentration

  • Designing, manufacturing and implementing of various machines for grinding and granulating sand and mountain rocks
  • Design and manufacture of cuts
  • Design and manufacture of separator magnets
  • Isolation of iron contaminants from mineral powders
  • Complex Concentration of Iron Ore (magnetite and hematite)

5) Removing colored and ferrous impurities from industrial soils

  • Removing of silica, kaolin, feldspar and other minerals

6) location allocation of mineral preparation factories and tailing dam of mines

  • Examining the geographical location of the factory site in terms of access, transportation distance, topography and weather conditions
  • Investigation of infrastructure factors (water, electricity, telecommunications and gas)
  • Assessing the location of the factory site from a social perspective (providing skilled and unskilled manpower)
  • Investigate the location of the factory site from an environmental perspective
  • Preliminary study of the construction site of the factory from a geotechnical perspective
  • Summarizing, prioritizing and selecting the location of the factory
  • Providing necessary reports and maps

7) Design of non-metallic mineral processing plants

  • Design of machines for transmission lines, accumulation and harvesting of materials
  • Design of various types of rotary and micron dryers
  • Design of ball mills, bar, rotary and roller mills
  • Design of advanced air, static and dynamic separators
  • Design of advanced air classifiers
  • Design of dusting systems

8) Preparation of feasibility studies for pretraetment  plant

  • Pre-investment studies (opportunity study, pre-feasibility and feasibility study)
  • Evaluation and decision making based on technical and economic criteria
  • Economic (financial) evaluation according to the standards of world banks
  • Economic (financial) evaluation of mineral pretraetment lines
  • Evaluating costs and providing a plan to reduce costs
  • Market study
  • Updating economic-technical evaluation reports